Heath-consultants GT Series Manuale Utente Pagina 29

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 170
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 28
3-7
OPERATING PROCEDURE
To switch OFF:
Press and hold NO . The screen, shown in
Fig. 3.9, is displayed.
Fig. 3.9 Switch OFF
Press and hold both the LH button and the RH
button
simultaneously to proceed with the
switch-off sequence.
4. Cal Due Date message is displayed with user
acknowledge for extended period option, if
overdue.
Calibration Due Date message is displayed, as
shown in Fig. 3.10.
Fig. 3.10 Calibration Due Date
Vedere la pagina 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 169 170

Commenti su questo manuale

Nessun commento